Our Projects

Prime Energy Limited is focused in the development, operation, maintenance and management of energy production power plants, in transmission lines and in sub-station in the region.

Our existing plants of ~6.2 MW produce at near full capacity independent and within the next 2-3 years, we plan to have close to 20 MW in energy production and becomming one of the largest independent Power Producers (IPP) in the region.

Currently, all our plants are hydropower based, but we will be exploring other forms of energy as we do our best to reduce the power deficit faced by the country and the region.

  • 1 .
    RUKARARA II
  • Type: Run of River Hydropower Plant
  • With: 2.2 MW
  • Status: Operational
  • Located: Nyamagabe District - RWANDA
  • 2 .
    MUKUNGWA II
  • Type: Run of River Hydropower Plant
  • With: 2.5 MW
  • Status: Operational
  • Located: Musanze District - RWANDA
  • 3 .
    GISENYI
  • Type: Run of River Hydropower Plant
  • With:1.2 MW
  • Status: Operational
  • Located: Rubavu District - RWANDA
  • 4 .
    GASHASHI
  • Type: Run of River Hydropower Plant
  • With:0.2 MW
  • Status: Operational
  • Located: Rutsiro District - RWANDA
  • 5 .
    RUKARARA VI
  • Type: Run of River Hydropower Plant
  • With:10 MW
  • Status: EPC Stage
  • Located: Nyamagabe District - RWANDA

Our Projects Gallery

Mukungwa II HydroPower Plant

With 2.5 MW

Rukarara VI

Expected to be commissioned in 2018. It will produce aproximately 10 MW

Mukungwa II

..

Gisenyi

> ..

Gisenyi

With 1.2 MW

Mukungwa II

With 2.5 MW

Gashashi

..

RUKARARA VI

With 10MVA, It is located

Gashashi

This has 0.2 MW

Rukarara II

This has 2.2 MW

Rukarara II

This has 2.2 MW

Gisenyi Hydropower Plant

With 1.2 MW